Bishopton Station
Client: First ScotRail
Value: £400k
Contract: SBBC without quantities
Project Description:
Construction of a combination of a steel and reinforced concrete construction pedestrian access ramp and steel staircase formed in a sloping embankment; the ramp comprises multiple ramp and landing areas traversing the embankment and a staircase section.
Works Included:
- Embankment excavation, earthworks and general preparation
- Minipile and ground beam and pads with holding down bolts
- Reinforced concrete retaining walls and ramps
- Metal safety balustrades
- Electrical lighting including builders works associated with the CCTV installation
- External works include temporary pathways (by others) and minimum soft landscaping and ground re-shaping works.