Linwood Point Car Park Paisley
Client: Group First
Value: £406k
Contract: SBCC Minor Works with Contracts Design
Project Description:
Construction of new 167 space car park plus associated earthworks, drainage and street light works
Works Included:
- Site Clearance
- Bulk excavation (9000m3)
- Installation of 150mm dia drainage pipes protected with concrete cover slabs
- Installation of new concrete manholes
- Concrete kerbs
- 80mm permeable block paving to parking bays as part of SUDS drainage system laid on graded stone and membrane filtration system with flow control into main sewer
- Asphalt surfacing to access road
- White lining
- Soft landscaping and seeding
- Street lighting works.
Photo Gallery
Click on image to view full screen




