Grangemouth SGT2 275kv Transformer Replacement
Client: SP Energy Networks
Value: £620k
Contract: NEC3 Engineering & Construction Contract, Option B
Project Description:
Demolition and Civils works for super grid transformer replacement
Works Included:
• Demolition of existing structures
• Construction of new reinforced concrete transformer bunds
• New reinforced concrete pad foundations
• Installation of new oily water drainage system including interceptor and isolation manholes
• New cable troughs and HV ducting
• Refurbishment of existing trough system including fitting new lids
• Excavation & Installation of earthing grid
• Installation of new SPEN specification HV compound fencing
• Construction of “Black Start” generator and fuel tank bases, ductwork and earthing